ScrumGames - Activities for the team
← Go to Time Machine

Time Machine Guide

We travel to the last day of the next sprint, and it went perfectly. From that future, the team shares what it achieved, what it did differently, and what it left behind. What repeats gets voted on and becomes an action.

Share each person the link to their card, or print the guide: each role gets its own page.

The phases at a glance

PhaseTimeWhat happens
Setup5 minEveryone joins and the host reads the journey.
Travel7 minEveryone writes from the future. Everyone else’s notes stay hidden.
Return10 minBack in the present, everyone shares their journey.
Vote5 minThe changes get voted on (what was achieved isn’t voted on).
Actions10 minThe 3 top-voted changes become commitments.
Wrap-up5 minThe actions are reviewed.

Host

The Scrum Master or whoever facilitates. They travel too.

Your mission: take the team to the future and bring back concrete changes.

Before the meeting 5 min

  • Open the Time Machine and create the room with your name, the sprint, and a host PIN. Keep it handy: you’ll need it if you switch devices.
  • Share the code, the link, or the QR code from Setup.

Travel 7 min

Close your eyes for a moment. It’s the last day of the next sprint, and everything went perfectly. What did we achieve? What did we do differently? What did we leave behind? Write it in the past tense, as if it already happened.

Return 10 min

We’re back in the present. Everyone shares their journey. Let’s look for what repeats.

Vote 5 min

Vote for the changes that bring us closest to that perfect sprint.

Actions 10 min

These are the 3 top-voted notes. For each one: what exactly are we going to do differently? Who owns it?

Write the action and pick the owner (one person or The whole team).

Wrap-up 5 min

Press Copy summary or Download .md, and then End retro, which removes everyone from the room. You can still open it from My rooms for 15 days.

It works really well after a tough sprint: it shifts the conversation from “what went wrong” to “what we’re going to do.”

Participants

The whole team.

Your mission: imagine the perfect sprint and discover what made it possible.

When you join

Open scrumgames.davidameth.dev, enter the room code (or scan the QR code) and your name. If your browser closes, open the same link and you’ll be back as the same person.

Travel 7 min

Write in the past tense, from the future: “we delivered everything,” “we refined with QA from the start,” “we stopped accepting changes after Wednesday.”

Return 10 min

Share your journey and listen to everyone else’s.

Vote 5 min

Spread your votes across the notes that would help most to work on. You can put several on the same note and take one back with −1 if you change your mind.

Be specific in “what we did differently”: that’s where the actions come from.

The three questions of the journey

What we achievedPicture the perfect sprint: what happened? It isn’t voted on.“We delivered everything and the demo was a hit.”
What we did differentlyWhat did we change to get there?“We refined the stories with QA from the start.”
What we left behindWhat did we stop doing?“Accepting scope changes after Wednesday.”

Golden rules