ScrumGames - Activities for the team
← Go to Sprint Roller Coaster

Sprint Roller Coaster Guide

The sprint as a roller coaster: everyone marks their highs and lows, day by day. The app draws the team’s emotional curve, and you walk through it to understand what caused each climb and each drop.

Share each person the link to their card, or print the guide: each role gets its own page.

The phases at a glance

PhaseTimeWhat happens
Setup5 minEveryone joins with the code.
Mark8 minEveryone marks moments: the day, how they felt, and what happened.
Walkthrough12 minThe curve is walked through day by day.
Vote5 minEveryone spreads 3 votes.
Actions10 minThe 3 top-voted moments become commitments.
Wrap-up5 minThe curve and the actions are reviewed.

Host

The Scrum Master or whoever facilitates. They take part too.

Your mission: help the team understand what moved the mood during the sprint.

Before the meeting 5 min

  • Open Sprint Roller Coaster and create the room with your name, the sprint, and a host PIN. Keep it handy: you’ll need it if you switch devices.
  • Keep the sprint calendar handy (10 workdays) to place the moments.
  • Share the code, the link, or the QR code from Setup.

Mark 8 min

Choose a day, how you felt, and what happened. Mark several moments: the highs and the lows.

Walkthrough 12 min

Let’s walk through the curve from day 1. What happened on this climb? And on this drop?

Stop at the peaks and the valleys: that’s usually where the most useful insights are.

Vote 5 min

Vote for the moments most worth repeating or avoiding next sprint.

Actions 10 min

These are the 3 top-voted notes. For each one: what exactly are we going to do differently? Who owns it?

Write the action and pick the owner (one person or The whole team).

Wrap-up 5 min

Press Copy summary or Download .md, and then End retro, which removes everyone from the room. You can still open it from My rooms for 15 days.

When lots of people drop on the same day, there’s a common cause: ask what happened that day before looking for solutions.

Participants

The whole team.

Your mission: mark your highs and lows of the sprint honestly.

When you join

Open scrumgames.davidameth.dev, enter the room code (or scan the QR code) and your name. If your browser closes, open the same link and you’ll be back as the same person.

Mark 8 min

Choose the sprint day, how you felt (from “at the top” to “at the bottom”), and write what happened. Press Mark moment and repeat for each moment.

Walkthrough 12 min

When the host reaches a day where you marked something, share it.

Vote 5 min

Spread your votes across the notes that would help most to work on. You can put several on the same note and take one back with −1 if you change your mind.

You don’t need to mark every day: 3 to 5 important moments is enough.

How you felt

At the topA really good moment.
Going upSomething that lifted the mood.
LevelA normal day.
Going downSomething that brought the mood down.
At the bottomThe hardest moment.

Golden rules