ScrumGames - Activities for the team
← Go to Sprint Sailboat

Sprint Sailboat Guide

The team is a sailboat. The wind is what pushed us forward, the anchors what held us back, the rocks the risks we see coming, and the island the goal. Everyone writes from their phone, the team votes, and 3 actions come out.

Share each person the link to their card, or print the guide: each role gets its own page.

The phases at a glance

PhaseTimeWhat happens
Setup5 minEveryone joins and the host explains the sailboat.
Write8 minEveryone writes their notes. Everyone else’s stay hidden.
Share10 minThe sailboat is walked through: island, wind, anchors, and rocks.
Vote5 minEveryone spreads 3 votes (the wind and the island aren’t voted on).
Actions10 minThe 3 top-voted notes become commitments.
Wrap-up5 minThe course is reviewed and the summary is saved.

Host

The Scrum Master or whoever facilitates. They take part too.

Your mission: help the team see at once what pushes it forward, what holds it back, and where it wants to go.

Before the meeting 5 min

  • Open Sprint Sailboat and create the room with your name, the sprint, and a host PIN. Keep it handy: you’ll need it if you switch devices.
  • Share the code, the link, or the QR code from Setup.

Setup 5 min

We’re a sailboat. The wind is what pushed us forward, the anchors what held us back, the rocks the risks we see coming, and the island is our goal.

Write 8 min

Write one idea per note and put it on its part of the sailboat. Don’t forget the island: where do we want to get?

Share 10 min

Let’s start with the island: where are we headed? Now the wind, the anchors, and the rocks.

Vote 5 min

Vote for the anchors to drop and the rocks to steer around.

Actions 10 min

These are the 3 top-voted notes. For each one: what exactly are we going to do differently? Who owns it?

Write the action and pick the owner (one person or The whole team).

Wrap-up 5 min

Press Copy summary or Download .md, and then End retro, which removes everyone from the room. You can still open it from My rooms for 15 days.

Start with the island: having a clear goal means the anchors and rocks get discussed with a purpose.

Participants

The whole team.

Your mission: place on the sailboat what you experienced and what you see coming.

When you join

Open scrumgames.davidameth.dev, enter the room code (or scan the QR code) and your name. If your browser closes, open the same link and you’ll be back as the same person.

Write 8 min

Pick the part of the sailboat (wind, anchors, rocks, or island), write one idea per note, and press Add note.

Share 10 min

Read your notes when the host walks through each part of the sailboat.

Vote 5 min

Spread your votes across the notes that would help most to work on. You can put several on the same note and take one back with −1 if you change your mind.

The rocks look ahead: think about risks in the next sprints, not just what already happened.

The parts of the sailboat

WindWhat pushed us forward. It isn’t voted on.“Good communication with the Product Owner.”
AnchorsWhat held us back.“Waiting on approvals from another team.”
RocksRisks we see coming.“The migration with no rollback plan.”
IslandThe team’s goal. It isn’t voted on.“Three sprints in a row with no critical bugs.”

Golden rules